Spring start-up or winterization of pool and equipment.
Pool openings include:
- Winter cover removed
- Removal of all winter block off plates, plugs, and ice compensation pillows
- Initial spring water analyses
- Water balancing report with chemical calculations
- Dispersal of initial spring start up chemical
- Filter system reassembly and equipment tested
- Pump primed
- General pool start-up and complete pool and equipment inspection
Pool closings include:
- Install winter block off plates and plugs
- Install ice compensation pillows
- Winter closing chemical dispersal
- Final water analyses
- Winter pool cover installed and secured with wire cable, clips, and water tubes
- Filter system disconnected and winterized
- Pump drained and winterized